Concrete | Grunwell Cashero
detroit
313-843-8440
cleveland
216-432-1488
toledo
419-476-2439
Stone bar

Concrete

FirstEnergy Stadium, Cleveland, OH

At the home of the Cleveland Browns, we replaced over 30,000 seats, and installed thousands of feet of expansion joints. All projects were completed between games with difficult scheduling requirements.

 

Waite High School Toledo, OH

We replaced or repaired 340 pieces of terra cotta at Waite High School, ground joints, installed sealant, and replaced brick throughout. All masonry surfaces were cleaned with a restoration cleaner.

 

St. Vincent Hospital, Toledo, OH

The west parking structure at St. Vincent Mercy Medical Center is a poured in place concrete and post tension structure built in 1972. The midwest climate with its changing seasons caused damage to the post tension cables, structural rebar and the concrete. Grunwell-Cashero was contracted to make the necessary repairs. This work spanned four years and included concrete repairs both partial and full depth replacement, post tension cable and anchorage replacement, joint sealant and traffic coatings.